October 1 update. Our PDGM and ICD-10 tools now use the FY2027 code set: 190 codes added, 30 deleted, and no existing code changed clinical group.

See what changed

OASIS Manual · For admins & DONs

M0090, Completion Windows, and Transmission Deadlines

The dates that drive every OASIS — RFA-specific completion windows, the M0090 date, and the 30-day iQIES transmission clock, with the CMS citation for each.

By Reza Djangi, OTR/L·7 min read·Aligned with OASIS-E2 v1.00.0

CMS source

OASIS-E2 Guidance Manual · Verified 2026-10-16

TL;DR

  • M0090 (Date Assessment Completed) is the date CMS holds up against the completion window, and the date the 30-day transmission clock runs from. iQIES also uses it to decide which version of the data specifications a record is checked against.
  • Completion windows depend on the RFA: 5 calendar days after the SOC date for SOC; 2 calendar days for ROC, Other Follow-up, Transfer, Death at Home and Discharge; days 56–60 of the 60-day period for Recert.
  • The CoPs give you 30 days from completing the assessment to transmit it (42 CFR §484.45(a)). A record sent later is still accepted, with a warning.

The 60-day cert at a glance

Timeline

Standard 60-day cert period

  1. Day 0 · RFA 01

    Start of Care

    OASIS comprehensive assessment must be completed within 5 days after the SOC date.

  2. Day 14 · RFA 03

    Resumption of Care window

    If the patient returns from a 24+ hour inpatient stay, complete within 2 calendar days.

  3. Day 30 · RFA 06 or 07

    Transfer event window

    Transfer assessment within 2 calendar days of learning of the transfer.

  4. Day 56 · RFA 04

    Recertification window — day 56

    Recert OASIS may be completed during the last 5 days of the cert (days 56–60).

  5. Day 60 · RFA 04 or 09

    Recert due — day 60

    Recert must be completed by day 60 if care continues. A patient who is not continuing is discharged with RFA 09.

What is M0090?

Specifies the actual date the assessment is completed. [...] The M0090 - Date Assessment Completed is the last date that information used to complete the comprehensive assessment and determine OASIS coding was gathered by the assessing clinician and documentation of the specific information/responses was completed. [...] If an error is identified at any time, it should be corrected following the agency's correction policy and M0090 would not necessarily be changed.

Source: OASIS-E2 Guidance Manual — Ch. 3, Section A, M0090, pp. 41–42 · Verified 2026-10-16

Completion windows per assessment type

OASIS data are collected at the time points listed in the table below, and within the required assessment timeframe. Not all OASIS items are completed at every assessment time point.

Source: OASIS-E2 Guidance Manual — Ch. 1, §1.5.5, p. 10 · Verified 2026-10-16

The assessment timeframe column of that table (Table 1.2), as CMS prints it:

Time point M0100 Assessment timeframe
Start of Care 1 Within 5 calendar days after the SOC date (SOC = Day 0)
Resumption of Care 3 Within 2 calendar days of the facility discharge date, or knowledge of the patient's return home
Recertification (follow-up) 4 The last 5 days of every 60 days (i.e., days 56-60 of the current 60-day period)
Other follow-up 5 Within 2 calendar days of significant change in patient's condition.
Transfer 6, 7 Within 2 calendar days of the discharge/transfer/death date, or knowledge of a qualifying transfer to an inpatient facility
Death at Home 8 Within 2 calendar days of the discharge/transfer/death date.
Discharge 9 Within 2 calendar days of the discharge/transfer/death date.

When the recert window is missed

If an agency misses the recertification assessment time frame (days 56-60 of the current 60-day certification period), the agency should not discharge and readmit the patient (i.e., complete a new SOC). Rather, the agency should send a clinician to perform the recertification assessment as soon as the oversight is identified. The date assessment completed (M0090) should be reported as the actual date the assessment is completed, with documentation in the clinical record of the circumstances surrounding the late completion. When submitting the assessment, a warning message will result from the non-compliant assessment date, but this will not prevent assessment transmission.

Source: OASIS-E2 Guidance Manual — Ch. 3, Section A, M0100, p. 46 · Verified 2026-10-16

The 30-day transmission rule

The deadline is in the Conditions of Participation, not the guidance manual. 42 CFR §484.45(a) says an HHA must encode and transmit each completed OASIS assessment "within 30 days of completing the assessment of the beneficiary."

Fixing a record after iQIES has accepted it

Effective January 1, 2020, HHAs have 24 months from the assessment target date to submit, modify, or inactivate OASIS records.

Source: OASIS-E2 Guidance Manual — Ch. 2, §2.4, p. 18 · Verified 2026-10-16

Common errors